top of page




Home Improvements and Repairs
John F. Chittick
704-502-671

BEFORE - Front door entry view
GOAL - Remove wall to install door unit and panels for "open" office space

AFTER - Front door entry view
French Door Unit with glass door panels installed for open office space.

Same Project: BEFORE - From across the hall in front door foyer.

AFTER - From across the hall .

Same Project: BEFORE - Inside room view.

AFTER - Inside room view.

Same Project: BEFORE - Foyer (outside room) view.

AFTER - Foyer (outside room) view.

Past Project - Installed Barn Door Kit

Past Project: BEFORE - Original Opening to Office

AFTER - New French Door Unit in Original Office Opening

FINISHED - French Door Unit in Office Opening

Renovation Project :BEFORE - load bearing wall removal

AFTER - Steel beam replacement for load-bearing wall

Other renovation project: BEFORE wall opening

AFTER - Wall opening and renovated kitchen

Installed Front Porch Rail System I
Black Pre-Welded Iron Rails - Installed between existing columns.

Front Porch Rail System II
Black Pre-Welded Iron Rails - Installed between existing columns.

Front Porch Rail System III
Black Pre-Welded Iron Rails Installed between existing columns.

BEFORE - Open air screened porch

AFTER - Heated/cooled interior sunroom.
bottom of page